Skip to content
Nabi Haus Nabi Haus
Tech Living Solutions Partnerships Talk to us
Solutions

Ten specialties, one single project.

Every system gets its own design. All of them enter the build under the same logic.

What we design and integrate

Executive design — client drawing
( 001 )

Construction documentation

Technical drawings of everything before any wall is drilled.

Pre-automation — infrastructure on site
( 002 )

Pre-automation

Infraestrutura pronta agora, equipamentos depois.

Centralized automation — rack and controller
( 003 )

Centralised automation

One controller running every system.

Wireless automation — renovation
( 004 )

Wireless automation

For renovations where no wall gets opened.

Redes — cabeamento estruturado
( 005 )

Ethernet and Wi-Fi networks

The invisible foundation for everything else.

Alarme e monitoramento — fachada
( 006 )

Electronic security

Cameras, alarm and access control.

Audio and video — home theater
( 007 )

Audio and video

Multiroom audio, cinema and distributed video.

Smart lighting — light scene
( 008 )

Smart lighting

By room, by scene and by time of day.

Central vacuum
( 009 )

Central vacuum

Embutida na estrutura, silenciosa e discreta.

Solar energy
( 010 )

Solar energy

Solar generation integrated into the logic of the house.

Executive design — client drawing

Construction documentation

Technical drawings of everything before any wall is drilled.

Pre-automation — infrastructure on site

Pre-automation

Centralized automation — rack and controller

Centralised automation

Wireless automation — renovation

Wireless automation

Redes — cabeamento estruturado

Ethernet and Wi-Fi networks

The invisible foundation for everything else.

Alarme e monitoramento — fachada

Electronic security

Audio and video — home theater

Audio and video

Smart lighting — light scene

Smart lighting

Central vacuum

Central vacuum

Solar energy

Solar energy

Solar generation integrated into the logic of the house.

Duas fases, na ordem certa

Phase 1

Design and on-site supervision

Prevents rework and improvisation on site.

Phase 2

Equipment and installation

Quoted after the design, with everything already sized.

Which of these systems do you want in your project?

A short conversation is enough to understand the stage of the build and tell you which systems make sense now and which can wait.